If you are interested in subscribing to the full report or would like to learn more, please contact us at [email protected]. 

Overview

This Foundry Monthly Intelligence Report provides timely, always-on market intelligence to keep you aligned with the latest developments in the foundry ecosystem. It includes ad hoc deep dives into emerging trends and market shifts, along with concise analyst takeaways that deliver real-time, decision-ready insights to support strategic planning and execution.

Table of Contents

The Shift in Agentic AI Computing Infrastructure and Its Impact on Foundry and Advanced Packaging. Three Takeaways from OCP 2026 About the Shift in Agentic AI Computing Infrastructure and Its Impact on Foundry and Advanced Packaging

  • Agentic AI has increased the demand for CPU computing power for workflow management. Meanwhile, longer task cycles and larger context windows are driving the industry toward multi-tier memory and storage architectures that integrate HBM, CXL-based memory, and SSD storage.
  • As power consumption per AI rack continues to climb, reaching 140 kW, 240 kW, and even over 350 kW, high-voltage power delivery and liquid cooling solutions are becoming increasingly critical for managing power loss and deployment costs.
  • Advanced process nodes, chiplet technology, and 2.5D/3D packaging are helping AI chip manufacturers address challenges related to reticle size limits, production yields, and power consumption. Furthermore, the wider interface of HBM4 places more stringent requirements on the manufacturing and integration of base dies.

A14 Is Running Earlier Than Expected and Packaging Builds Out on Three Tracks

  • A14 yield learning is running ahead of our original expectations. We expect risk production in 2027, a ramp in H1 2028 and meaningful volume in H2 2028, roughly one to two quarters earlier than previously expected.
  • The initial capacity ramp for A14 will begin in Hsinchu before extending to Taichung. The Arizona facility is unlikely to contribute any capacity before 2030.
  • CoWoS remains the top priority for TSMC’s packaging business, with current capacity already fully utilized. Capacity expansion for SoIC is proceeding at a more measured pace, while CoPoS is unlikely to reach a meaningful scale of production before the second half of 2028.

Demand-driven capacity expansion may continue until 2030 for main Chinese foundries

  • Strong local demand is underpinning the expansion of SMIC in both mature and advanced process nodes on 12’’ wafers. We project that its capacity for advanced process nodes will reach 60–70 KWPM by 2030.
  • HHG is focusing on 12” mature-node capacity through its HLMC Fab 5 acquisition and the future ramp of Wuxi Fab 9B. Its total capacity could reach around 350 KWPM once Fab 9B is fully loaded.

TSMC Keeps Adding Capacity for N3: Fab Roadmap Update and What Customers Are Actually Asking For

  • Years after the N3 process node entered mass production, TSMC continues to expand its capacity, reflecting sustained demand from AI GPUs, AI ASICs, and base dies for HBM.
  • AMD has requested additional capacity from TSMC, amounting to approximately 25,000 wafers, for the production of its MI450 products in 2027. However, TSMC has yet to make a firm commitment to meet this incremental demand. Final shipment volumes will also depend on the availability of supporting CoWoS packaging and substrate capacity.
  • Apple has reduced its N2 and N3 wafer orders by 10–15% amid weaker iPhone Duo build plans and higher memory costs. We believe AI demand can absorb this reduction, although a longer consumer slowdown remains a risk.